← Current opportunities

Featured AFG mandate

Industrial climate technology · Australian manufacturing

Turn industrial waste heat into productive electricity.

KATRIX is developing a proprietary small-scale organic Rankine cycle and expander platform for decentralised waste-heat electricity generation.

2.66 kWCurrent proof platform
20 kWCommercial development pathway
3 sectorsInitial industrial wedges
StagedEvidence-gated capital strategy
01

The industrial problem

Industrial processes reject large volumes of usable heat because conventional recovery systems are often too large, too bespoke or uneconomic at distributed scale.

  • Heat is already produced and paid for
  • Electricity can be generated close to the load
  • Modular recovery can improve project economics and resilience
02

Technology and evidence

The KATRIX platform combines proprietary expander engineering, thermodynamic optimisation, heat exchange, controls and power electronics. A working 2.66 kW platform anchors the current evidence base.

  • Physical proof platform—not a concept-only proposition
  • AI-assisted optimisation across technical variables
  • Development pathway to a 20 kW commercial system
  • Further validation remains stage-gated and visible
03

Commercial pathway

The first wedge is integration with pyrolysis and waste-to-energy systems, where heat availability and operating context are already known. Broader applications include food processing, agriculture, resources and distributed industrial energy.

  • Initial pyrolysis-linked field pathway
  • Customer deployment assets financed separately
  • Corporate capital funds platform de-risking, team and manufacturing readiness
  • Repeatable module strategy rather than one-off engineering
04

Capital strategy

AFG has separated corporate development capital from customer-machine funding. The corporate raise is staged against technical and commercial evidence gates; deployments can use project or asset-finance structures.

  • Prototype and validation milestones
  • IP, engineering team and manufacturing readiness
  • First-batch capability
  • Controlled release of terms and financial materials
05

What diligence should test

The opportunity is designed for serious technical, commercial and investment review—not headline-only climate positioning.

  • Independent technical validation
  • 20 kW performance and manufacturability
  • Customer contracts and deployment economics
  • Unit economics, margins and capital intensity
  • IP position, team build and execution timetable

Controlled diligence

Go beyond the public profile.

Suitable funders may request the detailed investor pack, financial information, technical materials and a management discussion. Access is subject to qualification and, where appropriate, confidentiality arrangements.

REQUEST ACCESS TO

KATRIX

  • Investor or information memorandum
  • Technical and commercial evidence
  • Capital pathway and use of funds
  • Management introduction
Request investor access